ANTSPACE HD5 CE Version 1765kW Hydro Mining Container
The ANTSPACE HD5 CE Version Mining Container delivers a revolutionary solution for industrial-scale operations. Specifically, this 40-foot structure accommodates 308 hydro-cooling miners from the latest Antminer generations. Furthermore, the specialized CE version meets strict European electrical standards. Consequently, mining farms can achieve peak efficiency through advanced thermal management. This powerful enclosure supports S23, S21, and S19 hydro series units effectively.
Advanced cooling technologies define the ANTSPACE HD5 CE Version Mining Container as a market leader. Notably, the integrated dry-cooling system ensures consistent temperatures for every connected miner. Additionally, the unit maintains a remarkably low PUE of 1.021 at standard conditions. Therefore, operators significantly reduce their energy overhead while maximizing hashrate stability. Moreover, the modular design allows for rapid deployment in diverse geographical locations.
Reliability remains a core feature for the ANTSPACE HD5 CE Version Mining Container during heavy workloads. Indeed, the rugged CCS-certified container protects sensitive hardware from harsh external environments. Furthermore, high-quality power distribution components manage up to 1765 kilowatts of total load. Each electrical circuit features individual protection to prevent widespread system failures. Consequently, the hardware remains safe even under demanding electrical stresses or fluctuations.
Standardization plays a vital role when choosing the ANTSPACE HD5 CE Version Mining Container for global expansion. For instance, the system utilizes a 400-volt input at 50 hertz for European power grids. Additionally, the enclosure features robust safety certifications like ISO 12100 and IEC 60204. These protocols guarantee safe operation and simplify the insurance process for large installations. Specifically, the container ships with pre-installed internal cabling and networking hardware.
Industrial miners increasingly rely on the ANTSPACE HD5 CE Version Mining Container to achieve maximum scale. Eventually, businesses can link multiple containers to a single 3750kVA transformer for high density. Moreover, the impressive 1500 kilowatt heat dissipation capacity handles the most powerful miners easily. Finally, this official Bitmain solution offers a future-proof path for professional cryptocurrency operations. Every component works together to create a sustainable and highly profitable mining infrastructure.
Technical Specifications
The ANTSPACE HD5 CE Version provides industry-leading performance metrics for large-scale liquid-cooled mining deployments across European regions.
- Miner Capacity: 308 units (S23 Hyd., S21 Hyd., S19 Hyd. Series)
- Maximum Power Capacity: 1765 kW
- Normal Operating Power: 1512 kW
- Input Voltage: 400V AC ± 5%
- Input Frequency: 50 Hz
- Power Usage Effectiveness (PUE): 1.021 (@ 25°C ambient)
- Cooling System Type: Hydro Cooling with External Dry Tower
- Container Certification: CCS (China Classification Society)
- Safety Certification: ANSI/ISO 12100:2012, IEC 60204 Ed 5.1 2009
- Total Heat Dissipation: 1500 kW
Notes
- Payment accepted in USDT, USDC, BTC, or USD. The unit price and total price of the products, and the amount paid are denominated in U.S. dollars.
- The shipping costs, customs charges, and taxes(if any) are not included in the retail price shown above.
- After an order has been submitted, a request to cancel the order, refund any part of the ordered amount or change the ordered item(s) to different item(s) or different batch(es) will not be entertained by BITMAIN.
- The pictures shown are for reference only; the final shipment version shall prevail.
- The Hashrate value, Power on wall, and Power efficiency on wall are all typical values, The actual Hashrate value fluctuates by ±3%, and the actual Power on wall and Power efficiency on wall fluctuate by ±5%.
- Caution: Wrong input voltage may probably cause product damaged.
Shipping Details
- Shipments will be scheduled on a first-paid-first-ship basis for orders on which BITMAIN has received full payment.
- You are responsible for any customs delays or returned shipments due to a lack of proper documentation. It’s highly recommended to be aware of local customs clearance policies and to prepare all customs documentation ahead of time to avoid any customs clearance delays or unexpected costs.
Warranty
- A 365-day warranty is provided starting from the shipping date. BITMAIN will cover shipping costs when shipping a replacement unit within the warranty period.
- The warranty only applies to the original purchaser who purchased the machine directly from BITMAIN. Once the miner is resold, warranty coverage becomes the responsibility of the re-seller.
- If the user fails to use the product per the given instructions, specifications, and conditions provided or changes the function settings of the unit without BITMAIN’s prior consent, BITMAIN will not be liable for any damage arising there from.








Reviews
There are no reviews yet.